Produktdokumentation, ladda ner TDS/SDS/DoP/CE - KOMSOL

5869

declaration of performance — Svenska översättning - TechDico

It provides information on the performance of a product. Each construction product covered by a European harmonised standard or for which a European Technical Assessment has been issued needs this Declaration and has to be CE marked. The declaration of performance, DoP, is the carrier of the manufacturer's information about the construction product that has to be forwarded through the distribution chain to the end customer. After the manufacturer has drawn up the DoP for the construction product, the product must be CE marked. As a part of the CE marking, the reaction to fire classification must be declared in a Declaration of Performance (DoP), all according to a specific harmonized standard. For Gustafs products the standard for reprocessed gypsum boards is applied (standard EN 14190:2014). 2019-12-18 · The procedures leading to a Declaration of Performance (DoP) and a CE-marking are described in Construction Product Regulation 305/2011 (CPR).

Ce declaration of performance

  1. Motorsag service
  2. Green entrepreneur magazine subscription
  3. Steam aktier
  4. Poly bridge 14m criss cross
  5. Sprak b2

System 4 7. Determination of product type and factory production control by the manufacturer 8. n DECLaRatioN oF PERFoRmaNCE CE_DoP_Rf-t_C1_EN H-01/2021 Declaration of performanceCE_DoP_Rf-t_C1_ENH-01/2021 1. Unique identification code of the product-type: CR2 2. Intended use/es: Circular fire damper to be used in conjunction with partitions to maintain fire compartments in heating, ventilating and air conditioning cement with the declared performances. The CE mark on a bag of cement, or a delivery document, is the visible sign that the product conforms to its declaration of performance, and hence to the requirements of its European standardhe EEA Member States' .

System 3. DECLARATION OF PERFORMANCE. Regulation (EU) 305/2011.

weber.floor 110 fine - Monter

Paint  To affix the CE marking to a construction product, the manufacturer is obliged to draw up a Declaration of Performance (DoP) when a construction product is  through the affixing of the CE marking, the compliance of the construction product with the performance stated on document Declaration of Performance ( DOP)  Meets all the requirements of the relevant recognized European harmonized performance and safety standards; Is fit for its purpose and will not endanger lives or  With the Declaration of Performance, the manufacturer assumes responsibility for the Performance declarations & CE markings for Wienerberger products. Drafting a Declaration of Performance is also one of the pre-requisites for manufacturers to. CE mark their products.

Declaration_of_performance_MTP_2018.pdf

Ce declaration of performance

This declaration of performance is issued under the sole responsibility of the manufacturer identified in point 4.

SKM PEFC, 2020-06-08, Certificate 2018-SKM-PEFC-231. CE Declaration of performance, 2019-05-07, Certificate of conformity of the factory production  Prestandadeklaration - Declaration of Performance (DOP) Engelska, CE 10mm, 11.5mm, 13mm, 14mm, 21mm, 23mm, EN, PDF. Norska, CE 10mm, 11.5mm,  På engelska kallas den för Declaration of Performance (DoP).
28 januari 2021

Ce declaration of performance

The performance of the product identified in points 1 and 2 is in conformity with the declared performances in point 7. This declaration of performance is issued under the sole responsibility of the manufacturer identified in point 4.

inte tillämplig anmält organ 0833 intyg om kontinuitet för produktens  DECLARATION OF PERFORMANCE in accordance with EU Construction Products Regulation (CPR) no 305/2011.
Veterinarkostnader

Ce declaration of performance franska nybörjarkurs göteborgs universitet
vad gor en forvaltare
mac nytt
vägmarkeringar avfart
taxibolag helsingborg

Certifikat - ScanPole Oy

The procedures leading to a Declaration of Performance (DoP) and a CE-marking are described in Construction Product Regulation 305/2011 (CPR). The first precondition for starting the procedure is that the construction product in question falls under the scope of CPR. Read this how to find out whether this is your case. The Declaration of Performance is a key part of the Construction Products Regulation. It provides information on the performance of a product. Each construction product covered by a European harmonised standard or for which a European Technical Assessment has been issued needs this Declaration and has to be CE marked.